[Hours] [Activity] 2019/12/16 Monday 0.48 #14816 revert PL_check global->thread fix for now 0.17 #17361 review test results and apply to blead 1.28 #17360 review test failure and open 17364, merge the test change ===== 1.93 2019/12/17 Tuesday 0.67 #17186 re-base, re-test and re-push 0.65 comment on signatures thread 0.05 #17186 review failing CI tests 0.40 #17353 review cflags.SH, make PR 17365 0.07 #17365 fix typo 0.23 #17368 review 0.87 #17348 review and comment ===== 2.94 2019/12/18 Wednesday 0.32 testing/cleanup of security repo 0.40 #17322 rebase, re-run tests to check cygwin failure, fix a typo, re-push 0.70 #17338 review, setup 32-bit VM 1.03 #17338 testing, comment ===== 2.45 Which I calculate is 7.32 hours. Approximately 10 tickets were reviewed or worked on, and 1 patches were applied.