(This report covers two weeks) I haven't done any TPF grant work for the last two weeks. This has been due to a combination of: * having flu; * doing other stuff; * tinkering with stuff on p5p instead; * being a bit stuck on the next phase my re_eval fixes; * a huge wave of can't-be-arsed-ness washing over me (aka post-xmas blues). -- A power surge on the Bridge is rapidly and correctly diagnosed as a faulty capacitor by the highly-trained and competent engineering staff. -- Things That Never Happen in "Star Trek" #9